INO-XC · renderFRONT 3/4 · ISO VIEW
Key specifications
Payload
On request
Format
Project-based
Lead time
20–36 wk
Standards
ISO 3691-4
Environment
ATEX / cleanroom / hot
Validation
FAT + SAT included
Configurations
Each configuration shares a common chassis. Pick the one that matches your duty cycle — we tune from there.
XC-AERO
Aerospace transporter
Fuselage, wing and engine moves. Cleanroom-compliant wheels, painted floor friendly.
XC-FOUNDRY
Foundry shuttle
High-temp, splash-rated platforms for ladle and casting transport.
XC-SAT
Satellite handling rig
Multi-axis, ultra-low-vibration platforms for clean integration halls.
Built for
- Aerospace integration halls
- Satellite & defense
- Foundries & metals
- Cleanrooms
- Hazardous environments
Gallery
Concept rendering
FEA validation
FAT photo
On-site commissioning
Operator HMI
Technologies used
See all technologies“Inogec was the only supplier willing to engineer to our cleanroom spec. They delivered, on time.”
— Program Manager, Aerospace Integrator
Want one configured for your floor?
Send us your payload, your throughput and a layout. We'll come back with a sized proposal.